Jim Bilyeu
New Member
Hi guys and Ladies,
Just thought I'd put a picture on here of our up and coming job. This project contains 42000 sq. feet of cedar siding ( rough side out ) with 8 coats of Behr applied. ( 5 building ) The reason we're stripping it down is because the Behr Rawhide is turning black with mildew. We will be cleaning and treating the cedar shake roofs also. We will be starting this job on Sept. 20TH. Anyone in the area is more than welcomed to stop by and take a look at our procedure for stripping, we're going to be there for awhile.
I was jst wondering, if you were going to bid a job like this, what would you bid ??
Jim Bilyeu
Exterior Woodcare
------------------
[This message has been edited by Jim Bilyeu (edited September 14, 2000).]
Just thought I'd put a picture on here of our up and coming job. This project contains 42000 sq. feet of cedar siding ( rough side out ) with 8 coats of Behr applied. ( 5 building ) The reason we're stripping it down is because the Behr Rawhide is turning black with mildew. We will be cleaning and treating the cedar shake roofs also. We will be starting this job on Sept. 20TH. Anyone in the area is more than welcomed to stop by and take a look at our procedure for stripping, we're going to be there for awhile.
I was jst wondering, if you were going to bid a job like this, what would you bid ??
Jim Bilyeu
Exterior Woodcare
------------------
[This message has been edited by Jim Bilyeu (edited September 14, 2000).]