Straight Shot
New Member
I currently have a 7@3500 unit equipped with a single gun. I am breaking into the hood industry and need to reduce our gpm's. Adding a second gun to our unit sounds like it may be the answer. Now the question, "How?"
I already know I need a tee or 2-way ball-valve to direct the flow into an alternate line (correct schedule). New chemical injectors & nozzles matched to the lower gpm flow. Then a gun and more hose. Our current unloader should do the job.
What else am I forgetting? It seems to easy.
------------------
Christopher Vaughn www.StraightShotPressureWashing.com
559.816.2402
[This message has been edited by Straight Shot (edited January 02, 2001).]
I already know I need a tee or 2-way ball-valve to direct the flow into an alternate line (correct schedule). New chemical injectors & nozzles matched to the lower gpm flow. Then a gun and more hose. Our current unloader should do the job.
What else am I forgetting? It seems to easy.
------------------
Christopher Vaughn www.StraightShotPressureWashing.com
559.816.2402
[This message has been edited by Straight Shot (edited January 02, 2001).]