New Look
Registerd User
This was an enjoyable job I did over in Berkeley, CA early in the season. Customer called and said that she called a few contractors but they never showed up to giver her an estimate. Anyway, gave her a price range over the phone as she needed to get this thing cleaned because it was a rental and the tenants were moving in that weekend.
Long story short, she met me at the job and basically said to TRY to get this as clean as possible. She didn't think it would clean up good. Needless to say she was pretty stoked of the results.
SH'd this very little SW1k. Needed some hang time for the SH to work. Rinsed off at around 135 degrees +/-. [getout]
Long story short, she met me at the job and basically said to TRY to get this as clean as possible. She didn't think it would clean up good. Needless to say she was pretty stoked of the results.
SH'd this very little SW1k. Needed some hang time for the SH to work. Rinsed off at around 135 degrees +/-. [getout]